Field operations — four disciplines
What we actually do on your ground
Four services, one crew, one machine park. Below is what each one covers, the tolerance we hold it to, and what lands in your quote before anyone tracks onto the parcel.
Ref. T-01
Earthworks
A platform that holds its levels through the first winter, so the trade after us builds on ground that does not move.
- Stripping and stockpiling of topsoil for reuse on site
- Cut and fill balanced on the parcel — every lorry movement we avoid is a line item you do not pay
- Grading to survey tolerance, checked at every pass
- Compaction tested before handover, not after
- Tolerance
- ±20 mm to survey
- Machines
- 8t – 25t excavators, D6 dozer
- Typical duration
- 3 – 15 days
Ref. D-02
Demolition
A structure taken down in a defined order, with the materials separated as they fall rather than sorted at a gate fee afterwards.
- Pre-demolition survey, including asbestos screening where the age warrants it
- Exclusion zones that move with the machine, and a spotter who can stop the work
- Concrete, steel, timber and plasterboard separated at the point of demolition
- Clean concrete crushed on site and reused as sub-base where the spec allows
- Sorting
- At source, 4 streams
- Machines
- High-reach, shears, crusher
- Typical duration
- 5 – 20 days
Ref. A-03
Drainage
The buried work nobody sees once the site is handed over, and the work that costs the most to get wrong.
- Continuous fall set and re-checked after bedding — pipe moves when you compact around it
- Mains and stormwater connections, septic systems
- Every line pressure- or air-tested with the trench still open
- Retention sized on the impermeable area you are actually creating, not the one on the original plan
- Testing
- Before backfill, recorded
- Depth
- Shored beyond 1.30 m
- Typical duration
- 4 – 12 days
Ref. M-04
Landscaping
Access roads, rock walls and final shaping — the part of the job that decides what the finished site looks like.
- Access roads built on a tested sub-base, not on hope
- Rock retaining walls placed to drain, with backfill graded behind them
- Terrain shaping and finish grading ready for planting
- A clean parcel at handover: no spoil heaps, no ruts, no leftover material
- Wall height
- Up to 4 m without engineering
- Machines
- 13t – 25t, rock grab
- Typical duration
- 3 – 10 days
Included as standard
What comes with the job
| Included as standard | T-01 Earthworks | D-02 Demolition | A-03 Drainage | M-04 Landscaping |
|---|---|---|---|---|
| Site survey and itemized quote | Included with Earthworks | Included with Demolition | Included with Drainage | Included with Landscaping |
| Fully insured works | Included with Earthworks | Included with Demolition | Included with Drainage | Included with Landscaping |
| Spoil balanced on site where possible | Included with Earthworks | Not applicable to Demolition | Included with Drainage | Included with Landscaping |
| Material sorting and disposal tracking | Not applicable to Earthworks | Included with Demolition | Not applicable to Drainage | Not applicable to Landscaping |
| Testing recorded before backfill | Not applicable to Earthworks | Not applicable to Demolition | Included with Drainage | Not applicable to Landscaping |
| Compaction test at handover | Included with Earthworks | Not applicable to Demolition | Included with Drainage | Included with Landscaping |
| As-built plan supplied | Included with Earthworks | Not applicable to Demolition | Included with Drainage | Not applicable to Landscaping |
Anything not listed here is quoted as a line, never assumed.
- Fully insured works
- 15 years in the field
- 320+ projects delivered
- Own fleet — 12 machines
- Waste tracking on every take-down
- 48-hour quote turnaround
Free site assessment
Tell us the parcel. We will tell you the plan.
Every quote follows a site walk — a figure written from a drawing alone is a guess dressed up as a commitment. We answer within 48 hours.