Rates & quotes

What groundworks cost, and why

Three ways to work with us. The rates below are real and indicative — the figure we hold to is the one written after we have walked your parcel. No lump sums, no surprise lines.

5 days billed as 4.5
R-01

Day rate

For short interventions and one-off jobs.

€780 excl. VAT

A machine and its operator on your parcel, billed by the day.

Get a quote
Minimum
Half a day
Mobilisation
Billed once per site
Fuel & operator
Included
  • One machine, one operator, one day on site
  • Delivery and collection of the machine quoted up front
  • You keep the flexibility to stop after any day
R-03

Framework

For developers and builders with recurring works.

Negotiated annual agreement

Negotiated rates, reserved machine slots, one point of contact.

Talk to us
Term
12 months, renewable
Slots
Reserved capacity
Invoicing
Consolidated, monthly
  • Rates fixed for the year, whatever the season does
  • Priority scheduling on reserved machine slots
  • One named site manager across every parcel
  • Consolidated monthly invoicing and reporting

All figures exclude VAT · Compare in detail

Line by line

What changes between them

What each engagement type includes
Included Day rateProject quoteFramework
Core
Site survey before quoting Included with Day rate Included with Project quote Included with Framework
Itemized written quote Not included with Day rate Included with Project quote Included with Framework
Fixed price held to signature Not included with Day rate Included with Project quote Included with Framework
Programme with committed dates Not included with Day rate Included with Project quote Included with Framework
Site & logistics
Machine delivery and collection Included with Day rate Included with Project quote Included with Framework
Operator, fuel and consumables Included with Day rate Included with Project quote Included with Framework
Spoil balanced on site where possible Not included with Day rate Included with Project quote Included with Framework
Reserved machine slots Not included with Day rate Not included with Project quote Included with Framework
Admin & insurance
Fully insured works Included with Day rate Included with Project quote Included with Framework
Waste tracking documents Not included with Day rate Included with Project quote Included with Framework
As-built plan at handover Not included with Day rate Included with Project quote Included with Framework
Consolidated monthly invoicing Not included with Day rate Not included with Project quote Included with Framework
Support
48-hour response on enquiries Included with Day rate Included with Project quote Included with Framework
Named site manager Not included with Day rate Included with Project quote Included with Framework
Single contact across all parcels Not included with Day rate Not included with Project quote Included with Framework

Before you compare quotes

What actually moves the figure

Access

A 25-tonne excavator that cannot reach the far corner changes the whole sequencing — and the figure. Tight urban plots cost more per cubic metre than open ground.

What the ground is made of

Rock, old fill and a high water table each change the method. This is exactly what the site walk is for: we would rather find it in the survey than mid-excavation.

Spoil balance

Cut and fill that balance on site save every lorry movement. When they do not balance, haulage and tipping become real line items.

Season

Winter ground works slower and wetter. We do not surcharge for it, but the programme lengthens, and duration is what you pay for on a day rate.

Disposal

Clean material costs little to move. Mixed or contaminated material carries gate fees we pass through at cost, with the tickets attached.

Before you ask

Straight answers

Why is there no fixed price list?

Because no two parcels are the same, and a figure written from a drawing alone is a guess dressed up as a commitment. The rates above are real and indicative; the quote that follows the site walk is the one we hold to.

How fast do I get a quote?

We answer every enquiry within 48 hours. For a project quote, the itemized figure lands within 48 hours of the site walk, which we usually schedule inside a week.

What happens if you hit rock?

On a project quote, ground conditions we could reasonably have identified during the survey are our risk, not yours. Genuinely unforeseeable conditions are handled as a variation, priced and agreed before the machine moves again — never invoiced as a surprise.

What if the weather stops the job?

On a project quote the price does not move; the programme does, and we tell you the same day. On a day rate you are not billed for a day we cannot work.

Do you discount multiple phases?

Yes. Consecutive phases on the same parcel avoid a second mobilisation, and that saving goes into the quote. Recurring work across several sites is what the framework agreement is for.

Do you work for private clients as well as builders?

Both. Roughly half our work is private — house platforms, drainage, access roads — and half is commercial. The method does not change; the paperwork does.

Are you insured, and what does that actually cover?

Every project is covered by public liability and works insurance, and we send the certificate with the quote rather than on request. Damage caused by our works is our problem to fix.

When do I pay?

Project quotes are staged: 30% to secure the slot, 40% at the midpoint of the programme, 30% at handover once you have walked the site with us. Day rates are invoiced monthly.

Still unanswered? The full FAQ covers the site itself.

Free site assessment

The quote is free. So is the walk that produces it.

Tell us the parcel and what you need to build on it. We answer within 48 hours, and the site walk costs you nothing whether or not you go ahead.