Reading the terrain before you dig
A survey costs a day. Getting the platform wrong costs a season. How we assess ground before a single machine rolls onto site.
Every platform we deliver starts the same way: two people, a level, and a walk across the whole parcel before anyone quotes a number. Drawings tell you what the client wants. The ground tells you what it will cost.
What we look for on the first pass
- Water. Where it arrives, where it sits, where it wants to leave. Standing water in August is a drainage problem in November.
- Fill vs. natural ground. Old fill compacts differently and shows up as settlement two winters later.
- Access. A 25-tonne excavator that cannot reach the far corner changes the entire sequencing — and the price.
- Spoil balance. Cut and fill that balance on site save every lorry movement we would otherwise have to invoice.
Why the quote comes after, never before
We answer every request within 48 hours, but the itemised figure lands after the site walk. A quote written from a plan alone is a guess dressed up as a commitment, and the difference surfaces exactly when it is most expensive to fix — mid-excavation, with the crew standing.
Survey first, dig second. The extra day at the start is the cheapest day in the whole programme.
The deliverable
You get a platform to survey tolerance, a documented spoil balance, and a handover that the next trade can build on without remediation. That is the whole point of the first pass.