Author

Marc Belin

Marc Belin

Site Manager

Fifteen years reading terrain, from suburban plots to industrial platforms. Runs our earthworks crews.

Marc joined Terra Artisan as a machine operator and now runs the earthworks crews. He plans every platform on site rather than from an office, and he is the one who signs off tolerances before a slab goes down.

His rule of thumb, repeated on every job: the ground tells you what it needs before the drawings do. Survey first, dig second.

3 articles

Written by Marc Belin

Reading the terrain before you dig

A survey costs a day. Getting the platform wrong costs a season. How we assess ground before a single machine rolls onto site.

Controlled demolition: sorting as you go

Taking a structure down cleanly is a sequencing problem. Separating the materials while you do it is what keeps disposal costs sane.

The right machine at the right moment

Owning our own fleet is not about the machines. It is about being able to put the correct one on site on the day it is needed.

Back to field notes